Except for the carpet, Mrs.Tyme and I performed all the work. Tore out the old,nasty, mold infested Chinese dry-wall. Applied vapor barrier and re-hung new green-board. Painted and installed baseboard and window and door trims.

Of course we addressed all the problems that led to the water intrusion that caused the damage in the first place.

Click image for larger version. 

Name:	20161107_195116_HDR_resized.jpg 
Views:	462 
Size:	39.3 KB 
ID:	14063

Click image for larger version. 

Name:	20161217_164116_HDR_resized.jpg 
Views:	444 
Size:	44.9 KB 
ID:	14064Click image for larger version. 

Name:	20161217_164127_HDR_resized.jpg 
Views:	443 
Size:	60.9 KB 
ID:	14065

The Icebreaker wood-stove has it at 80 degrees inside with the outside at 14. The basement is 24 x 39 so that was a lot of dry-wall on the walls. We only had to install 3 sheets on the ceiling.