Search Fishin.com |
The new ramp is finished, the dock master told me today, the ramp will open with in 10 days they are letting the concrete cure, I was also told they extened the part past the water line to a depth of 4 feet, I hope the facts are accurate, we are told the lake could possibly drop another 2 ft. you can still launch at the old ramp Ill try an let everyone know when its open
today I had batt issue and caught 4 SM near the dock in about 40 minutes biggest almost 19 inches, on livebait
Thanks Rick, that is good to know, please keep us posted.
Grumpy