
| Search Fishin.com |
The Coe is planning some sort of diverter to be installed on one of the sluice gates at the base of the Dam to be used in case of a long dry period/Draught.
These gates are never used normally and can not keep up with a high input to the lake. The plan is to keep cold/ O2 rich water in the first 35miles of the river VS the normal 75 miles. That beats 0.
I like the sounds of it, should help alot.
