Wow....great job....what happened to the stone counter tops? Come on tight wallet.....spring for em
Printable View
Wow....great job....what happened to the stone counter tops? Come on tight wallet.....spring for em
[QUOTE=HURRICANEBOB;517029]Wow....great job....what happened to the stone counter tops? Come on tight wallet.....spring for em[/QUOTE]
Granite came in about 4500..........JUST for the tops. Not doing it in my cheap ass house. As it is this will be the most expensive remodel I've done........EVER.
[ATTACH=CONFIG]5701[/ATTACH]
[ATTACH=CONFIG]5874[/ATTACH][ATTACH=CONFIG]5875[/ATTACH][ATTACH=CONFIG]5876[/ATTACH][ATTACH=CONFIG]5877[/ATTACH]
First Pick is of the HOLE we cut to replace the lights over the sink.
Second is the stove and micro......
Third is the Valance and finish trim done.
Fourth is the Puck Lights we installed over the sink.
Things left to do:
Back Splash and detail.
Trim or Wood under the cabinets.......kick board??
Floor.
I'm done for a few weeks though. Headed to Canada. Wohoo.
Has the wife had friends over to look at the new kitchen and nice work??? Maybe lining up more jobs up for you at friends houses?? Hahaha :)
i need to do the same but I'm thinking nope!!! Maybe in a year or ten! :)
GeoFisher, I feel your pain. I am presently moving to a new farm close to Eli, Ky so now I am in fixing things on the new house and getting my present home ready to sell, plus getting my other farm ready to sell. That doesn't include going through 50 years of hoarding. I hope that makes you feel a little better. The only saving grace is I am only 4 miles from the lake.
Some more pictures...........almost done. I took about 3-4 weeks off..........
[ATTACH=CONFIG]6502[/ATTACH]
[ATTACH=CONFIG]6503[/ATTACH]
[ATTACH=CONFIG]6504[/ATTACH]
Backsplash Tile almost done..........It has been installed. Putting grout in tomorrow.
WOHOO.
The only thing left is the floor and cabinet pulls.......
Then I get to start working on water issues around my downstairs.
Later,
Geo
[ATTACH=CONFIG]6518[/ATTACH]
[ATTACH=CONFIG]6519[/ATTACH]
[ATTACH=CONFIG]6520[/ATTACH]
[ATTACH=CONFIG]6523[/ATTACH]
More Pictures............we took 2-3 months off because we ran out of budget :) :) . Still not completely done, but really really close. We still have floor trim work to do and then I think it is done.
[ATTACH=CONFIG]7107[/ATTACH][ATTACH=CONFIG]7108[/ATTACH][ATTACH=CONFIG]7109[/ATTACH][ATTACH=CONFIG]7110[/ATTACH][ATTACH=CONFIG]7109[/ATTACH][ATTACH=CONFIG]7111[/ATTACH]
And I'm finally done.
Finished up the trim work a couple days ago........
[ATTACH=CONFIG]7141[/ATTACH][ATTACH=CONFIG]7142[/ATTACH][ATTACH=CONFIG]7143[/ATTACH]
Now onto other projects, including removing a bearing wall downstairs, adding a laminated beam, and creating a GREAT ROOM.
New Laminate Wood floor down there, new carpet, new paint, maybe paneling, new trim ,and while I'm at it..........HVAC Zone Control.
Wohoo.
Later,
Geo
Here are some pics of my Serving bar that I had the opportunity to put in TWICE........
Note to self........Never EVER tile over wood :) :)
[ATTACH=CONFIG]7569[/ATTACH][ATTACH=CONFIG]7570[/ATTACH][ATTACH=CONFIG]7571[/ATTACH][ATTACH=CONFIG]7572[/ATTACH]
Now , I might be close to being done :) :)