Quote Originally Posted by the_donger View Post
“The Corps of Engineers expects the new bridge to be ready for traffic sometime after the first of next year. To be prepared for that timetable the contractor needs to construct temporary roadway connections this fall.”

http://www.kentuckyroads.com/news/1422.html

THANKS Tim