Search Fishin.com

Results 1 to 12 of 19

Hybrid View

  1. #1
    Join Date
    Oct 2008
    Posts
    472
    Post Thanks / Like

    Re: Corps suspends work on part of Wolf Creek Dam project

    Look at the bright side. If they ever do raise it back to normal the fishing will be better the longer they wait. If they wait another 5-10 years to get it to normal when they raise it Cumberland will be one of the hottest lakes in the south with all that brush and trees.

    On a side note all the effort put into creating brushpiles for when the water raises may have been a wasted effort if it isnt raised. Heck they may be rotted by then if it does raise.

  2. #2
    Join Date
    Feb 2009
    Location
    Danville
    Posts
    788
    Post Thanks / Like

    Re: Corps suspends work on part of Wolf Creek Dam project

    Realistically, it will be completed in 10 years.

  3. #3
    Join Date
    Feb 2008
    Location
    Bowling Green
    Posts
    321
    Post Thanks / Like

    Re: Corps suspends work on part of Wolf Creek Dam project

    i heard on the radio today they stopped work because some sensors that had been placed showed movement or vibration.

Similar Threads

  1. Below Wolf Creek Dam
    By wags in forum Kentucky Discussion Board
    Replies: 12
    Last Post: 01-27-2011, 03:07 PM
  2. Need Part Time Work
    By boondock in forum Help Wanted-Work Wanted
    Replies: 0
    Last Post: 01-06-2011, 12:54 PM
  3. Wolf Creek Dam work suspended ???
    By Rock_Fish in forum Fly Fishing (General Discussion)
    Replies: 1
    Last Post: 03-10-2010, 09:23 PM
  4. Craigs creek ramp project started
    By F16ENGMGR in forum Kentucky Fishing Tournaments
    Replies: 7
    Last Post: 08-27-2009, 11:07 PM
  5. Cumberland Corps Dam Project Link
    By peter in forum Kentucky Discussion Board
    Replies: 6
    Last Post: 02-15-2007, 12:15 AM

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts
  •