I don't know where the bridge girders will be built, but, they could be built at Stupp Bridge in Bowling Green and shipped right down 68/80. Once the the shop had the material those girder sections could prob be shipped in three weeks or so. If there's room on the schedule and in the shop to work them thru. I lasted little over two years there when they first moved to B G. They put out a good product but man that's a hellish place to have to make a living. I'm all for getting it back up as soon as possible!!!



Reply With Quote