Search Fishin.com

Results 1 to 12 of 14

Hybrid View

  1. #1
    Join Date
    Dec 1969
    Location
    Evansville Area of Southern IN, USA.
    Posts
    1,170
    Post Thanks / Like

    Re: Oil, And Plenty Of It!

    I also worked at the refinery located in Robinson, IL. I worked with Young Insulation which did a lot of the work at that refinery. Without the insulation on the pipes that refinery would not have been able to continue to operate.

    And I know a thing or two about getting permits to construct new factories like refineries. You might find a name on a few of those permits that looks familiar to me.

    Believe me if Marathon wanted to build a new refinery they would be allowed to build it in a heart beat.

    Your statement about taking 20 years to get the permits is hogwash. Not sure who gave you that talking point but they don't have a clue as to what they are talking about.

    Obtaining a construction permit takes less than a year and they are easily obtained when the plant is designed to meet the Clean Air Act Requirements.



    Just recently a permit was issued to the refinery in Mt Vernon, IN to increase that refineries capacity. They had zero problems getting their construction and operating permits from IDEM APCD.

    You probably don't even know what APCD stand for do you?

  2. #2
    Join Date
    Dec 1969
    Location
    Louisville
    Posts
    2,256
    Post Thanks / Like

    Re: Oil, And Plenty Of It!

    I know some of you have mentioned alternative power. I saw on Fox News today that some environmental groups are trying to fight wind power. They are saying it takes away from the beauty of the land.

    It feels like we just can't win. Ryan.

  3. #3
    Join Date
    Dec 1969
    Location
    Palestine, Illinois, USA.
    Posts
    1,733
    Post Thanks / Like

    Re: Oil, And Plenty Of It!

    Quote Originally Posted by Moose1am View Post
    I also worked at the refinery located in Robinson, IL. I worked with Young Insulation which did a lot of the work at that refinery. Without the insulation on the pipes that refinery would not have been able to continue to operate.

    And I know a thing or two about getting permits to construct new factories like refineries. You might find a name on a few of those permits that looks familiar to me.

    Believe me if Marathon wanted to build a new refinery they would be allowed to build it in a heart beat.

    Your statement about taking 20 years to get the permits is hogwash. Not sure who gave you that talking point but they don't have a clue as to what they are talking about.

    Obtaining a construction permit takes less than a year and they are easily obtained when the plant is designed to meet the Clean Air Act Requirements.



    Just recently a permit was issued to the refinery in Mt Vernon, IN to increase that refineries capacity. They had zero problems getting their construction and operating permits from IDEM APCD.

    You probably don't even know what APCD stand for do you?
    I agree with expansion permitting not being a problem but to pemit a new facility is a huge problem. That is why they are expanding all the existing plants.

Similar Threads

  1. College BB a plenty tonight fellas
    By mhall in forum "Off Topic" Posts
    Replies: 0
    Last Post: 01-17-2011, 01:32 PM

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts
  •